OFFSET
1,2
COMMENTS
Order corresponds to bolts encountered clockwise from top dead center (TDC). Similar patterns for (fewer) bolts are at the same reference including 20,16,12,8 and 4
LINKS
Piping Designer, Bolt Tightening Sequence
EXAMPLE
TDC bolt is tightened 1st, the adjacent CW bolt 9th, the next CW bolt 17th, etc
CROSSREFS
KEYWORD
easy,nonn,fini,full
AUTHOR
Bill McEachen, Feb 02 2011
STATUS
approved